Filtry

Szukana fraza: [Abstrakt = "In November 2015 SH16 Tunnel in Birtouta \- Sidi Abdallah \- Zeralda Railway project in Algeria was designed. As a superstructure of the tunnel a soil\-steel structure with deep corrugation 380 x 140 mm was chosen. The tunnel is 180 m long, has a diameter of 12 m and three bends. The maximum cover depth above the structure is around 7 m. To increase bolted connection capacity, due to extremely large axial force, unique 4\-row bolts connections were used with class 10.9 bolts. Main reasons to choose corrugated steel plates technology were savings and short installation time. As a fully watertight tunnel was required, a double sealing system was designed. The first element of the system is a permanently flexible sealant applied along overlaps and in plastic caps on the bolted connections. As the second element of the watertightening system an EPDM membrane was proposed \(for the first time ever\) to entirely cover the round shape of the tunnel. Connections between pieces of EPDM were made according to the manufacturer’s specific instructions. The installation of the structure began in December 2015 and was executed by teams of the main contractor supervised by a technical assistant from ViaCon Construction sp. z o.o. and one of the designers. The SHI6 tunnel is the first ViaCon structure supplied to Maghreb countries."]

Wyników: 0

Brak wyników. Zmień kryteria wyszukiwania.

Ta strona wykorzystuje pliki 'cookies'. Więcej informacji